Skip to knowledge content

Topic 21

Buying, selling and unapproved work

Check approvals and completion documents when buying or selling, and understand options for addressing unapproved work.

12 articles

Buying

Selling

Putting it right

07Regularisation certificates: the process, the cost and opening up workRegularisation is the retrospective building-control process for eligible unauthorised work begun on or after 11 November 1985. The council may require drawings, opening up, tests and remedial work before it can issue a certificate; the application fee is not the whole cost.08Retrospective planning permissionRetrospective planning permission is an application to retain development carried out without the necessary permission or contrary to it. Approval is not guaranteed, and applying does not replace building-regulations approval or automatically stop enforcement.09Certificate of lawfulness for existing works and the 10-year ruleA certificate of lawfulness for existing development confirms the planning status of the specific work or use described in it. In England, the 2024 change introduced ten-year enforcement periods for newer building operations and single-dwelling changes of use, while preserving four-year periods for qualifying earlier cases.10A chimney breast removed years ago with no sign-offHave the remaining chimney and its support assessed, then establish the appropriate building-control route. The fact that a chimney breast was removed years ago does not show that the retained masonry is safely supported or that the work was approved.11A load-bearing wall removed years ago with no sign-offArrange a structural assessment and check the building-control history before treating an old wall removal as resolved. A visible beam, lack of obvious cracking or the passage of time is not, by itself, evidence that the opening was correctly designed and approved.12An extension built over a sewer without an agreementFirst establish whether the pipe is public, when the extension was built and whether an agreement was required for that work. Where Thames Water’s approval is missing, a retrospective assessment may be possible, but it is not guaranteed and may require evidence or changes to protect the sewer.