Access to the neighbour's land and scaffolding over the boundary

The Party Wall etc. Act can provide access to neighbouring land where it is necessary for work covered by the Act, subject to its conditions and notice requirements. It does not give a general right to use the neighbour's garden or airspace for all parts of a building project; scaffolding outside that right needs a separate lawful arrangement. [1][2]

Start with the purpose of the access

Section 8 concerns entry for executing work in pursuance of the Act, and includes access for the statutory surveyor's purposes. The key question is not whether access would be convenient, but whether the proposed entry falls within the right conferred by that section. [1]

For example, access connected with qualifying work to a party structure needs a different assessment from using the neighbour's garden as a general storage or delivery area. A party wall award is not a licence for every activity taking place on the wider project. [1][2]

Identify the part of the work requiring access, the proposed route, the area occupied and the period needed. Ask the appointed surveyor to distinguish statutory access from anything requiring the neighbour's separate agreement. [2]

Notice and safeguards

The normal requirement is at least 14 days' notice to the adjoining owner and occupier before exercising section 8 entry rights. Entry is during usual working hours; in an emergency, notice is to be given as far as reasonably practicable. An approaching contractor booking is not a reason to disregard those requirements. [1]

The Act also requires avoidance of unnecessary inconvenience and compensation for loss or damage resulting from qualifying work. Where adjoining land or a building is laid open, the building owner must provide and maintain the protection required by the Act. [3]

Discuss practical arrangements for doors, security, occupied rooms, weather protection and removal of temporary equipment. These arrangements should explain how the statutory duties will be met, rather than merely stating that access has been “allowed”. [3][2]

Scaffolding needs its own assessment

RICS guidance recognises that scaffolding can be relevant to statutory access, but the legal basis must be considered in relation to the actual work. Do not assume that a scaffold is authorised simply because some other part of the project has a party wall award. [2]

Where there is no applicable statutory or existing property right, agree an appropriate access or scaffolding licence before installation. Record the permitted area, duration, protection, removal and making-good arrangements. The Act does not supply a standard licence fee, and no universal market charge should be assumed. [2]

The 1992 Act is not a general extension-access right

The Access to Neighbouring Land Act 1992 allows a court to grant access for qualifying work reasonably necessary to preserve land or property where it cannot be carried out, or would be substantially more difficult, without entry. The court must also consider the effect on the adjoining owner and occupier. [4]

It is therefore not a blanket entitlement to build a new extension from next door's land. Obtain advice about the specific work and available route rather than threatening entry under the wrong Act. [4]

If access is disputed, use the surveyor and legal process. Do not force access on the strength of a general explanation of the law. [1][5]