Skip to knowledge content

Topic 16

Specialist reports and consultants

Understand specialist reports, when they may be requested and which consultants prepare them.

34 articles

Statements

Fire

Nature and trees

07Biodiversity Net Gain: when it applies, the exemptions and the August 2026 changesBiodiversity Net Gain normally requires applicable development to deliver at least a 10% increase in biodiversity value. From 6 August 2026, new applications for sites of 0.2 hectares or less are exempt unless they affect onsite priority habitat, and the separate self-build/custom-build exemption has been removed for new applications.08BNG metric, habitat plan and buying off-site unitsWhere BNG applies, the statutory metric calculates the biodiversity baseline and proposed gains, while the biodiversity gain plan explains how the obligation will be met. A habitat management and monitoring plan addresses delivery over time; buying off-site units is a separate transaction that must be correctly registered and allocated.09Preliminary ecological appraisal and bat surveysA preliminary ecological appraisal identifies the ecological issues a proposal may affect and whether more detailed surveys are needed. Bat surveys are a separate, targeted part of that process where buildings, trees or other features could support bats.10Tree survey, arboricultural impact assessment and tree protection planA tree survey records the trees that could be affected, an arboricultural impact assessment explains the effects of the design, and a tree protection plan shows how retained trees will be protected. Councils can need this information for trees on neighbouring land as well as within the application site.11Urban Greening FactorThe Urban Greening Factor is a way of assessing the amount and quality of greening in a development, supported by a plan and calculation. In London it is associated with policy G5; the exact submission requirement and target must be checked against the relevant borough policy and current guidance.

Water and ground

Effects on neighbours and the environment

16Daylight and sunlight reportA daylight and sunlight report assesses natural light within a proposed development and the effect of that development on neighbouring buildings and spaces. It is needed where those effects are material to the planning decision, rather than automatically for every extension.17Noise reportA noise report assesses whether a proposal will create unacceptable noise or vibration, or expose its occupants to existing noise. Councils request it where the location, activity or equipment makes those effects relevant to the planning decision.18Air quality assessmentAn air quality assessment examines the pollution a development could cause and the exposure of people using it. It may be needed because of traffic, plant, construction activity or the existing air quality at the site, even where the development itself produces little pollution.19Odour and kitchen extraction reportAn odour and kitchen extraction report explains how cooking fumes will be captured and discharged without unacceptable effects on neighbours. It usually needs to address noise and the physical appearance of the extraction system as well as odour, so equipment selection cannot be separated from the planning design.20External lighting assessmentAn external lighting assessment explains how proposed lighting will perform and whether it could harm neighbours, road users, wildlife or the character of the area. It is needed where those effects are material, rather than simply because a project includes any outdoor light.

Energy and sustainability

21Energy statementAn energy statement explains how a development will reduce energy demand and carbon emissions and meet the planning policies applying to the site. It brings the proposed building fabric, heating, renewable energy and supporting calculations together; it is not simply an equipment list.22Sustainability statement and checklistA sustainability statement explains how a proposal addresses the environmental requirements relevant to the site, while a checklist records where those matters have been covered. The required scope is set by the application and local policies; a ticked form should not replace the evidence needed to support its answers.23Overheating assessmentAn overheating assessment tests whether the proposed design can provide acceptable summer conditions and identifies any measures needed to control heat. It can be required by planning policy as well as building regulations, but those routes do not always cover the same work or use the same assessment brief.24BREEAMBREEAM is a third-party assessment and certification system for the environmental performance of buildings. A planning authority may require a particular assessment or outcome for qualifying development, but that local requirement should not be mistaken for a universal requirement on every building project in England.25Whole life-cycle carbon and circular economy statementsA whole life-cycle carbon assessment measures carbon associated with a building across its life, while a circular economy statement explains how materials and buildings will be retained, reused and managed to avoid waste. They are related assessments, but one does not replace the other.

Transport and construction

Housing and viability

Consultants and surveys