Rainwater: soakaways and sustainable drainage

Rainwater drainage should use the appropriate sustainable route rather than automatically connecting a new roof or driveway to the nearest sewer. Building regulations prioritise infiltration where practicable, then a watercourse, with sewer discharge considered where the earlier options are not reasonably practicable. [1]

Start with the site, not a standard soakaway detail

Establish the proposed roof and paved areas, levels, available space and existing drainage routes. A soakaway is only useful where the ground and location can accommodate infiltration appropriately. Approved Document H provides the drainage guidance; the national SuDS standards explain the broader approach to runoff and site constraints. [1] [2]

Ask the drainage designer what investigation is needed to establish ground conditions and infiltration performance. Do not assume a feature will work because a similar-sized extension elsewhere used it. The evidence should relate to the actual site and proposed discharge arrangement. [2]

Consider sustainable drainage as a system

SuDS can combine features that manage runoff, water quality and the place around the building. The national standards consider a hierarchy that includes water reuse and infiltration, followed by other discharge routes where appropriate. The chosen combination should respond to feasibility rather than merely add a labelled feature to the plan. [2]

For a constrained site, explain which options were considered and why any preferred route is not practicable. That is more useful than labelling a sewer connection “existing” without checking whether it can lawfully and technically receive the changed runoff. [1] [2]

Keep foul and surface water distinct

The drainage design needs to identify which system carries foul water and which carries rainwater. Do not connect a rainwater downpipe to an unidentified pipe simply because it is nearby. Approved Document H addresses drainage arrangements, the separation of systems and consultation over relevant sewer connections. [1]

Where proposed foundations or drainage work affect a public sewer, the relevant build-over or diversion process remains separate. A sustainable drainage drawing does not itself authorise construction near the public asset. [3]

Planning and building control may both ask questions

The national SuDS standards support drainage design, but their publication does not make every recommendation an identical statutory requirement for every small alteration. Establish which requirements arise through building regulations, the planning application and any site-specific condition. [2] [1]

Plan for inspection and maintenance

Show the drainage route, levels, access and discharge point on the technical drawings. Agree what needs inspecting before trenches and drainage features are covered. Keep the completed layout and the maintenance information with the handover documents so the system can be looked after as designed. [4] [2]

A satisfactory result is a drainage arrangement supported by site evidence, approved where necessary and capable of being maintained—not simply a soakaway symbol or a new pipe into the nearest chamber.

Sources 4 references
[2]
National standards for sustainable drainage systems

Defra / GOV.UK · accessed 2 Oct 2026

[3]
Do I need a build over agreement?

Thames Water · accessed 2 Oct 2026

[4]
Starting work and inspections

Building Control Partnership, Hampshire · accessed 2 Oct 2026

Contact

Need advice on your property?

Talk to our team about planning, regulations or construction.